Investigation assessment and rock mass characterisation for the design of (cut and embankment) soil and rock slopes, tunnel support, rock reinforcement systems for alternatives of major rock cutting or shallow tunnelling options adjacent and beneath the junction of the M1 and M62 motorways. On behalf of Pell Frischmann Consultants and the Department of Transport. Site conditions included glacial soils and sandstone rock.

PAKISTAN

Report on behalf of Pacific Consultants International, Tokyo for the Indus Highway Project. Foundation study of three major bridge crossings on partly limestone and sandstone rocks. Appraisal of sites and advise on the design of revised investigation program, including geotechnical studies.

UK

Royal Portbury Docks, Bristol, fast-track investigations for a turnkey contract including quay wall strengthening and conveyor system foundations for a new coal handling terminal on behalf Rendel Palmer and Tritton and First Corporate. Investigations in soft fill materials, dredged fill and variable sandstone and carbonate rocks.

UK

Salisbury A36 bypass. Engineers Representative for the Main Ground Investigation and Interpretative Report including earthworks and bridge foundations recommendations on behalf of RPT and the Department of Transport. Investigations in fresh and weathered chalk soils and chalk rocks.

UK

Plymouth Shell Oil Refinery. Inspection and reporting of installed limestone rock reinforcement measures at a coastal tank farm.

UK

Salisbury A36 by pass. Part of RPT team for a major road investigation (predominately in fresh and weathered chalk soils and chalk rocks), covering several routes of the proposed by pass around the Salisbury area.

UK

Oxford A40 By Pass. Part of RPT team for the road investigation (in over-consolidated clay, peri-glacial and alluvial soil deposits), north of Oxford.

UK

M4-Brynglas Relief Road Scheme; an investigation in rock including special reports on a rock structure assessment of coal-measure rocks based on impression packer and rock discontinuity surveys for Sir Owen Williamson & Partners.

UK

Hinkley Point 'C' Site Investigations. Site Engineer involved with hydrological studies and in-situ test including packer, large diameter plate bearing and pressuremeter testing in carbonate and mudstone rock.

UK

North Devon Link Road (11B). Site Engineer for road investigations including new In-Situ testing. Investigations in alluvial soils and variable mud rocks.

SIERRA LEONE

Lumley Beach Hotel. Foundation design report for new coastal hotel location. Recommendations for foundation design and relocation on poor tropical soils.